
SDC 2002
3. Operational Preparations
3-2
Operating Instructions - Rev. 1 / 6.2003
3.2. POWER-UP
The film scanner is powered up with the mains switch ”Power” at the front of the film
scanner (Fig. 301: 1).
To switch on the Graphical Control Panel GCP1 ( Fig. 301: 2), press the power
button 3.
To avoid EMC (electromagnetic compatibility) problems keep the rear doors
always closed during operation!
After 15 minutes operating time, all characteristics are stabilized.
1
Film Scanner SDC 2002
Diagnostics PC
3
SDC 2002 Thomson
Spirit
DataCine
2
11
2
Graphical Control Panel
Fig. 301: Film scanner SDC 2002
Warm-up
Komentarze do niniejszej Instrukcji